• Türkçe
    • English
  • Türkçe 
    • Türkçe
    • English
  • Giriş
Öğe Göster 
  •   Açık Erişim Ana Sayfası
  • Avesis
  • Dokümanı Olmayanlar
  • Makale
  • Öğe Göster
  •   Açık Erişim Ana Sayfası
  • Avesis
  • Dokümanı Olmayanlar
  • Makale
  • Öğe Göster
JavaScript is disabled for your browser. Some features of this site may not work without it.

Coupled Mechanical and Hydraulic Modeling of Geosynthetic-Reinforced Column-Supported Embankments

Tarih
2009
Yazar
Oztoprak, Sadık
Huang, Jie
Han, Jie
Üst veri
Tüm öğe kaydını göster
Özet
Geosynthetic-reinforced column-supported (GRCS) embankments have increasingly been used in the recent years for accelerated construction. Numerical analyses have been conducted to improve understanding and knowledge of this complicated embankment system. However, most studies so far have been focused on its short-term or long-term behavior by assuming an undrained or drained condition, which does not consider water flow in saturated soft soil (i.e., consolidation). As a result, very limited attention has been paid to a settlement-time relationship especially postconstruction settlement, which is critical to performance of pavements on embankments or connection between approach embankments and bridge abutments. To investigate the time-dependent behavior, coupled two-dimensional mechanical and hydraulic numerical modeling was conducted in this study to analyze a well-instrumented geotextile-reinforced deep mixed column-supported embankment in Hertsby, Finland. In the mechanical modeling, soils and DM columns were modeled as elastic-plastic materials and a geotextile layer was modeled using cable elements. In the hydraulic modeling, water flow was modeled to simulate generation and dissipation of excess pore water pressures during and after the construction of the embankment. The numerical results with or without modeling water flow were compared with the field data. In addition, parametric studies were conducted to further examine the effects of geosynthetic stiffness, column modulus, and average staged construction rate on the postconstruction settlement and the tension in the geosynthetic reinforcement.
Bağlantı
http://hdl.handle.net/20.500.12627/79337
https://doi.org/10.1061/(asce)gt.1943-5606.0000026
Koleksiyonlar
  • Makale [92796]

Creative Commons Lisansı

İstanbul Üniversitesi Akademik Arşiv Sistemi (ilgili içerikte aksi belirtilmediği sürece) Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.

DSpace software copyright © 2002-2016  DuraSpace
İletişim | Geri Bildirim
Theme by 
Atmire NV
 

 


Hakkımızda
Açık Erişim PolitikasıVeri Giriş Rehberleriİletişim
sherpa/romeo
Dergi Adı/ISSN || Yayıncı

Exact phrase only All keywords Any

BaşlıkbaşlayaniçerenISSN

Göz at

Tüm DSpaceBölümler & KoleksiyonlarTarihe GöreYazara GöreBaşlığa GöreKonuya GöreTürlere GöreBu KoleksiyonTarihe GöreYazara GöreBaşlığa GöreKonuya GöreTürlere Göre

Hesabım

GirişKayıt

Creative Commons Lisansı

İstanbul Üniversitesi Akademik Arşiv Sistemi (ilgili içerikte aksi belirtilmediği sürece) Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.

DSpace software copyright © 2002-2016  DuraSpace
İletişim | Geri Bildirim
Theme by 
Atmire NV