• Türkçe
    • English
  • Türkçe 
    • Türkçe
    • English
  • Giriş
Öğe Göster 
  •   Açık Erişim Ana Sayfası
  • Avesis
  • Dokümanı Olmayanlar
  • Makale
  • Öğe Göster
  •   Açık Erişim Ana Sayfası
  • Avesis
  • Dokümanı Olmayanlar
  • Makale
  • Öğe Göster
JavaScript is disabled for your browser. Some features of this site may not work without it.

Classification and resolution procedure for disputes in public construction projects

Tarih
2021
Yazar
Sari, Mahmut
Akcay, Cemil
SAYIN, Barış
Üst veri
Tüm öğe kaydını göster
Özet
Construction sector, which is associated with approximately two hundred sub-sectors in terms of employment area, plays the role of locomotive sector in economic development of countries. This feature of the sector affects economy directly and indirectly. Despite this positive contribution of the sector, disputes are inevitable between parties -administration and contractor- in a bid, contract and implementation processes, which are parameters of the construction process. Formal judicial process applied for the purpose of resolving disputes encountered in construction projects that the public assumes the role of employer, takes a long time. Therefore, while contractor is exposed to financial losses, administration cannot conclude public investment. In the study; disputes in public construction projects are classified, and proposals preventing disputes are presented. In this scope, firstly, 174 of 10591 disputes submitted to Court of Cassation, and 84 of 102 disputes submitted to Directorate of High Technics Board are selected regarding public construction projects. In the second stage, parameters causing disputes are classified under six main items. Thirdly, reasons of the disputes for each classification are detailed, and then proposals are presented for prevention of the disputes based on FIDIC (International Federation of Consulting Engineers) contract forms. Finally, a resolution procedure is developed for the processes including bid, contract and implementation phases based on FIDIC. By the presented proposals for GCCW (General conditions of construction works) official resolution paths can be reduced to a minimum, and the processes result positively for administration and contractors. It is concluded that the developed procedure is suitable as a practical tool for resolution process of the disputes in the public construction projects.
Bağlantı
http://hdl.handle.net/20.500.12627/172088
https://doi.org/10.7764/rdlc.20.2.259
Koleksiyonlar
  • Makale [92796]

Creative Commons Lisansı

İstanbul Üniversitesi Akademik Arşiv Sistemi (ilgili içerikte aksi belirtilmediği sürece) Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.

DSpace software copyright © 2002-2016  DuraSpace
İletişim | Geri Bildirim
Theme by 
Atmire NV
 

 


Hakkımızda
Açık Erişim PolitikasıVeri Giriş Rehberleriİletişim
sherpa/romeo
Dergi Adı/ISSN || Yayıncı

Exact phrase only All keywords Any

BaşlıkbaşlayaniçerenISSN

Göz at

Tüm DSpaceBölümler & KoleksiyonlarTarihe GöreYazara GöreBaşlığa GöreKonuya GöreTürlere GöreBu KoleksiyonTarihe GöreYazara GöreBaşlığa GöreKonuya GöreTürlere Göre

Hesabım

GirişKayıt

Creative Commons Lisansı

İstanbul Üniversitesi Akademik Arşiv Sistemi (ilgili içerikte aksi belirtilmediği sürece) Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.

DSpace software copyright © 2002-2016  DuraSpace
İletişim | Geri Bildirim
Theme by 
Atmire NV