Basit öğe kaydını göster

dc.contributor.authorTokgoz, Nuray
dc.date.accessioned2021-03-04T09:58:06Z
dc.date.available2021-03-04T09:58:06Z
dc.identifier.citationTokgoz N., "Use of TBM excavated materials as rock filling material in an abandoned quarry pit designed for water storage", ENGINEERING GEOLOGY, cilt.153, ss.152-162, 2013
dc.identifier.issn0013-7952
dc.identifier.othervv_1032021
dc.identifier.otherav_6ad8d2a9-9124-42c5-b201-e11f43fac3f1
dc.identifier.urihttp://hdl.handle.net/20.500.12627/73913
dc.identifier.urihttps://doi.org/10.1016/j.enggeo.2012.11.007
dc.description.abstractMaterial from tunnel excavations (muck) for Istanbul's metro rail transport system must be rapidly removed from the construction site and stored in a suitable area. This time restriction necessitates categorization of the excavation materials according to technical specifications and usability. The excavated material (muck) could be used as aggregate in concrete, filling and paving material in road construction, and as a soil replacement for covering or foresting stony/rocky areas, etc. This study examines the use of the tunnel boring machine (TBM) excavation material (muck) as rock filling in water storages, and as rock embankments in abandoned quarry pits designed for water storage. The study was designed in two phases. In the post excavation phase, physical and mechanical properties of materials [sandstone, shale, and diabase] excavated from the Kadikoy-Kartal metro tunnels were tested under laboratory conditions for their suitability as rock and crushed stone (aggregate) material. In the pre-excavation phase, a total of 227 samples representing eight different rock types were analyzed in this geotechnical study of the tunnel route. This phase contains core-drilling data during the tunnel opening survey.
dc.language.isoeng
dc.subjectJeoloji Mühendisliği
dc.subjectMühendislik ve Teknoloji
dc.subjectTemel Bilimler (SCI)
dc.subjectJEOLOJİ
dc.subjectYerbilimleri
dc.subjectYER BİLİMİ, MULTİDİSİPLİNER
dc.subjectMühendislik, Bilişim ve Teknoloji (ENG)
dc.subjectMühendislik
dc.subjectMÜHENDİSLİK, JEOLOJİK
dc.titleUse of TBM excavated materials as rock filling material in an abandoned quarry pit designed for water storage
dc.typeMakale
dc.relation.journalENGINEERING GEOLOGY
dc.contributor.departmentİstanbul Üniversitesi , Mühendislik Fakültesi , Maden
dc.identifier.volume153
dc.identifier.startpage152
dc.identifier.endpage162
dc.contributor.firstauthorID38107


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster