Basit öğe kaydını göster

dc.contributor.authorYildirim, Hatice Acar
dc.contributor.authorAkcay, Cemil
dc.date.accessioned2021-03-04T09:42:42Z
dc.date.available2021-03-04T09:42:42Z
dc.date.issued2019
dc.identifier.citationYildirim H. A. , Akcay C., "Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach", REVISTA DE LA CONSTRUCCION, cilt.18, sa.3, ss.554-567, 2019
dc.identifier.issn0718-915X
dc.identifier.othervv_1032021
dc.identifier.otherav_698e42c0-33a7-4137-a417-6d4365d846e8
dc.identifier.urihttp://hdl.handle.net/20.500.12627/73115
dc.identifier.urihttps://doi.org/10.7764/rdlc.18.3.554
dc.description.abstractConsidering the construction industry holds ten percent on average in the gross national product over the world, the importance of efficient use of resources emerges. To alleviate the possibility of the risk factors and various uncertainties' negative impact on the project, the usage of the scheduling tools should be supported for planning as well as risk management. In today's construction perspective, the quality is not a primary objective; construction projects have to be completed within the cost and duration limits. During the construction progress, the inserting of extra activities affects to construction delays. Project success; from the planning stage to the completion of the building, it is possible to plan the resources, use them efficiently, and realize the determined time and cost objectives. In this study, a model is developed by using a fuzzy logic approach and genetic algorithm in order to provide time-cost optimization in construction projects under uncertainties. Firstly, fuzzy sets are used to take into account the effects of time and cost uncertainties on construction works. Fuzzy sets are used to model uncertainties, and the genetic algorithm is used to acquire minimum Project cost and duration. Thus, by establishing a fuzzy time-cost optimization model, optimum time-cost results are obtained according to different risk levels determined by the decision-makers. At the final stage, Pareto fronts from different risk levels that contain both minimum costs and durations are obtained and plotted.
dc.language.isoeng
dc.subjectMühendislik ve Teknoloji
dc.subjectYapı
dc.subjectİnşaat Mühendisliği
dc.subjectMÜHENDİSLİK, SİVİL
dc.subjectMühendislik, Bilişim ve Teknoloji (ENG)
dc.subjectMühendislik
dc.subjectİNŞAAT VE YAPI TEKNOLOJİSİ
dc.titleTime-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach
dc.typeMakale
dc.relation.journalREVISTA DE LA CONSTRUCCION
dc.contributor.departmentİstanbul Üniversitesi , ,
dc.identifier.volume18
dc.identifier.issue3
dc.identifier.startpage554
dc.identifier.endpage567
dc.contributor.firstauthorID271084


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster