• Türkçe
    • English
  • English 
    • Türkçe
    • English
  • Login
View Item 
  •   Home
  • Avesis
  • Dokümanı Olmayanlar
  • Makale
  • View Item
  •   Home
  • Avesis
  • Dokümanı Olmayanlar
  • Makale
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

An analytical and applied blasting approach to facilitate rock-socketed bored pile excavation

Date
2020
Author
KARADOĞAN, Abdulkadir
Gunay, Mustafa Kemal
SERTABİPOĞLU, Zeynep
ÖZYURT, Meriç Can
KALAYCI ŞAHİNOĞLU, Ülkü
ÖZER, Ümit
Zaif, Cevdet Burkay
Sefer, Ibrahim
Metadata
Show full item record
Abstract
Conventional bored piling excavation technique in a rock formation is a time-consuming and costly operation due to excavation speed. Blasting can be a useful method for the reduction of rock strength before bored pile excavation by breaking the rock in an area as large as the bored pile diameter. In this way, the drawbacks of pile driving operation can be minimized in terms of project time and cost. In this study, the usability of blasting was investigated in order to increase the speed of conventional bored piling excavation. For this aim, an analytical method based on the airy stress function was established to determine the fragmentation zone that provides sufficient fragmentation to facilitate the bored pile excavation operation in a motorway cut and cover tunnel project. In the model, the detonation pressure, the tensile strength of rock, explosive properties, and drill hole diameter were taken into consideration. The developed model was tested by three different blasting designs and a non-blasting excavation to verify its applicability for the bored pile excavation in the site. As a result, the suggested blasting method can be used in rock-socketed bored pile driving studies to obtain a fragmentation zone as much as pile diameter in order to increase excavation speed and reduce cost and to provide expected excavation performance. This study introduced a first in the literature that the blasting technique was used as the first stage of bored pile excavation. In addition, the developed method can be applied by revising according to different rock conditions and it can be used as a basic pre-design approach.
URI
http://hdl.handle.net/20.500.12627/4758
https://doi.org/10.1007/s12517-020-05549-7
Collections
  • Makale [92796]

Creative Commons Lisansı

İstanbul Üniversitesi Akademik Arşiv Sistemi (ilgili içerikte aksi belirtilmediği sürece) Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV
 

 


Hakkımızda
Açık Erişim PolitikasıVeri Giriş Rehberleriİletişim
sherpa/romeo
Dergi Adı/ISSN || Yayıncı

Exact phrase only All keywords Any

BaşlıkbaşlayaniçerenISSN

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsTypesThis CollectionBy Issue DateAuthorsTitlesSubjectsTypes

My Account

LoginRegister

Creative Commons Lisansı

İstanbul Üniversitesi Akademik Arşiv Sistemi (ilgili içerikte aksi belirtilmediği sürece) Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV