Basit öğe kaydını göster

dc.contributor.authorKumral, Mustafa
dc.contributor.authorUĞURLU, Ömer Faruk
dc.date.accessioned2021-03-02T17:50:47Z
dc.date.available2021-03-02T17:50:47Z
dc.date.issued2020
dc.identifier.citationUĞURLU Ö. F. , Kumral M., "Reliability-based performance analysis of mining drilling operations through Markov chain Monte Carlo and mean reverting process simulations", SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, cilt.96, ss.593-604, 2020
dc.identifier.issn0037-5497
dc.identifier.otherav_c56cfa90-9f73-4a17-969e-b634bf52854c
dc.identifier.othervv_1032021
dc.identifier.urihttp://hdl.handle.net/20.500.12627/4455
dc.identifier.urihttps://doi.org/10.1177/0037549720923751
dc.description.abstractIn recent years, commodity prices have swiftly decreased, narrowing the profit margin for many mining operations and forcing them to find effective cost management strategies to respond to low prices. Given that equipment is one of the most significant assets of a mining company, efficient equipment utilization has strong potential to reduce costs. This paper focuses on the relationship between the number of available drilling machines based on reliability analysis and the number of holes to be created on a bench of an open pit mining operation. Since equipment availability is random in nature, a range of holes to be drilled corresponding to a specified probability level was determined. To assess the performance of the proposed approach, a case study was carried out using two stochastic modeling techniques. Evolutions of reliabilities of 10 rotary drilling machines over a specific time were simulated by Markov chain Monte Carlo and mean reverting processes, using historical data. Multiple simulations were then used for risk quantification. Results show that the proposed approach can be used as a tool to assist production scheduling and assess the associated risk.
dc.language.isoeng
dc.subjectBİLGİSAYAR BİLİMİ, YAZILIM MÜHENDİSLİĞİ
dc.subjectBİLGİSAYAR BİLİMİ, İNTERDİSİPLİNER UYGULAMALAR
dc.subjectBilgisayar Bilimi
dc.subjectMühendislik, Bilişim ve Teknoloji (ENG)
dc.subjectMühendislik ve Teknoloji
dc.subjectVeritabanı ve Veri Yapıları
dc.subjectBilgisayar Grafiği
dc.subjectBilgisayar Bilimleri
dc.titleReliability-based performance analysis of mining drilling operations through Markov chain Monte Carlo and mean reverting process simulations
dc.typeMakale
dc.relation.journalSIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL
dc.contributor.departmentİstanbul Üniversitesi-Cerrahpaşa , Mühendislik Fakültesi , Maden Mühendisliği Bölümü
dc.identifier.volume96
dc.identifier.issue7
dc.identifier.startpage593
dc.identifier.endpage604
dc.contributor.firstauthorID2282431


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster