Basit öğe kaydını göster

dc.contributor.authorAslan, Selman
dc.contributor.authorTurkakin, Osman Hurol
dc.date.accessioned2022-07-04T15:13:20Z
dc.date.available2022-07-04T15:13:20Z
dc.identifier.citationAslan S., Turkakin O. H. , "A construction project scheduling methodology considering COVID-19 pandemic measures", JOURNAL OF SAFETY RESEARCH, cilt.80, ss.54-66, 2022
dc.identifier.issn0022-4375
dc.identifier.otherav_a3ecb444-d515-4c45-b50a-f98d303b86ca
dc.identifier.othervv_1032021
dc.identifier.urihttp://hdl.handle.net/20.500.12627/184052
dc.identifier.urihttps://doi.org/10.1016/j.jsr.2021.11.007
dc.description.abstractIntroduction: At the beginning of the COVID-19 pandemic, various social measures were taken and various sectors were affected with strict precautions and safety measurements. The construction industry, where numerous employees work together, was affected by these COVID restrictions. The pandemic period typ-ically further delayed the construction contracts. Methods: This study addresses the project duration, pan-demic risk, and project cost of a construction project case by using both multi-objective genetic algorithm and resource constrained project scheduling techniques, using modeling of COVID-19 infection rate. Finally, the analytic hierarchy process (AHP), a multi-objective technique, is used to obtain an optimal solution using three criteria: project duration, total cost, and pandemic risk value. Results: A case study is used for analyzing the outcomes of the pandemic-based modeling, the original schedule of the case study ends in 46 days. Feasible schedules are obtained with durations occurring between 61 to 199 days, the pandemic risks range from 46% to 89%, and the total cost varies from 174,669.8 Turkish Lira (TL) to 186,126.7 TL. Consequently, the most optimal-final solution is obtained Alternative 5 (0.46% pandemic risk, 199 Day (10 workers) with 185,722 TL). Conclusion: We conclude that the possible rate of pandemic-related delays can be obtained by using both these techniques and the infection modeling method. Using the COVID-19 infection rate modeling, duration and cost changes are calculated by con-sidering infection risk in construction workers. Practical Applications: Using the COVID-19 infection rate modeling, project delays and cost overruns are determined by considering infection risk in construction workers. Optimum worker sizes and delayed construction activities are determined according to the selected solution by using the AHP technique. Expectedly, this study may help determine the construc-tion process while preserving social distances between construction workers during pandemic situations like COVID-19. (c) 2021 National Safety Council and Elsevier Ltd. All rights reserved.
dc.language.isoeng
dc.subjectEpidemiology
dc.subjectSocial Sciences & Humanities
dc.subjectPhysical Sciences
dc.subjectHealth Sciences
dc.subjectERGONOMİ
dc.subjectSosyal Bilimler Genel
dc.subjectSosyal Bilimler (SOC)
dc.subjectKAMU, ÇEVRE VE İŞ SAĞLIĞI
dc.subjectSOSYAL BİLİMLER, İNTERDİSİPLİNER
dc.subjectSosyoloji
dc.subjectMühendislik
dc.subjectMühendislik, Bilişim ve Teknoloji (ENG)
dc.subjectSosyal ve Beşeri Bilimler
dc.subjectULAŞIM
dc.subjectMühendislik ve Teknoloji
dc.subjectSafety Research
dc.subjectSocial Sciences (miscellaneous)
dc.subjectGeneral Social Sciences
dc.subjectTransportation
dc.subjectHuman Factors and Ergonomics
dc.subjectManagement of Technology and Innovation
dc.subjectHealth (social science)
dc.subjectManagement Information Systems
dc.subjectGeneral Engineering
dc.subjectEngineering (miscellaneous)
dc.subjectPublic Health, Environmental and Occupational Health
dc.subjectOccupational Therapy
dc.titleA construction project scheduling methodology considering COVID-19 pandemic measures
dc.typeMakale
dc.relation.journalJOURNAL OF SAFETY RESEARCH
dc.contributor.departmentMuş Alparslan Üniversitesi , ,
dc.identifier.volume80
dc.identifier.startpage54
dc.identifier.endpage66
dc.contributor.firstauthorID3401709


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster