• Türkçe
    • English
  • Türkçe 
    • Türkçe
    • English
  • Giriş
Öğe Göster 
  •   Açık Erişim Ana Sayfası
  • Avesis
  • Dokümanı Olmayanlar
  • Makale
  • Öğe Göster
  •   Açık Erişim Ana Sayfası
  • Avesis
  • Dokümanı Olmayanlar
  • Makale
  • Öğe Göster
JavaScript is disabled for your browser. Some features of this site may not work without it.

Analysis of factors associated with the amount of forest road reconstruction activity in Turkey: Autoregressive distributed lag modelling approach

Yazar
DEMİR, Murat
AKGÜL, Mustafa
Acar, Hafiz Hulusi
AKAY, Anıl Orhan
Üst veri
Tüm öğe kaydını göster
Özet
Forest roads are one of the most essential structures for the continuity of timber harvesting operations. To ensure continuity, forest roads must be open and stable during all seasons. The purpose of this study is to determine the relationships between the amount of forest road reconstruction (FRR) and the factors associated with it. These include average precipitation (AP) amount, timber harvesting (industrial wood) (TH) amount and forest road repair and maintenance (FRREM) amount. Also, study aims to test appropriate statistic models for forest road planning and management. In this study, an autoregressive distributed lag (ARDL) model, which is a time series analysis method, is used. Results from the ARDL model demonstrate that an increase in the amount of TH and AP in the long-run relationship negatively affected FRR amounts. In the short-run relationship, the TH and AP variables negatively affected the FRR variable, whereas the FRREM variable positively affected the FRR variable. Granger causality test results show that in the short run there was a one-way causality from FRREM to FRR. Also, for the Granger causality test in the long run, there was causality from other variables to FRREM. This demonstrates that timber harvesting amounts and changes in precipitation amounts due to climate change should be considered when determining road reconstruction activities. In addition, this work will enable forest road managers to make effective and accurate FRR budget planning decisions.
Bağlantı
http://hdl.handle.net/20.500.12627/131097
https://doi.org/10.1016/j.foreco.2019.117800
Koleksiyonlar
  • Makale [92796]

Creative Commons Lisansı

İstanbul Üniversitesi Akademik Arşiv Sistemi (ilgili içerikte aksi belirtilmediği sürece) Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.

DSpace software copyright © 2002-2016  DuraSpace
İletişim | Geri Bildirim
Theme by 
Atmire NV
 

 


Hakkımızda
Açık Erişim PolitikasıVeri Giriş Rehberleriİletişim
sherpa/romeo
Dergi Adı/ISSN || Yayıncı

Exact phrase only All keywords Any

BaşlıkbaşlayaniçerenISSN

Göz at

Tüm DSpaceBölümler & KoleksiyonlarTarihe GöreYazara GöreBaşlığa GöreKonuya GöreTürlere GöreBu KoleksiyonTarihe GöreYazara GöreBaşlığa GöreKonuya GöreTürlere Göre

Hesabım

GirişKayıt

Creative Commons Lisansı

İstanbul Üniversitesi Akademik Arşiv Sistemi (ilgili içerikte aksi belirtilmediği sürece) Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.

DSpace software copyright © 2002-2016  DuraSpace
İletişim | Geri Bildirim
Theme by 
Atmire NV